The aim of the study was the evaluation of the absorption of funds from the Cohesion Fund within the Operational Program Infrastructure and Environment for 2007–2013, Priority IX: Environmentally-friendly power infrastructure and power effectiveness, Action 9.4 – Generation of energy from renewable sources. The source material constituted data acquired from the Department of European Funds of the Ministry of Energy (institution implementing the action). The methods of comparative analysis were used for the purpose of the evaluation. The final result of the analyzed action was the performance of 64 facilities in 71 locations for total value of PLN 5 749 million, with co-funding of PLN 1 520 million. Circa 82% of this amount was allocated to 55 investments in “wind power” and the remaining part to 12 biogas plants (9,3%) and 4 power plants powered with solid biomass (8,7%). As a result of the performance of the studied action, the power of the sources generating electric energy increased by 823 MWe, including wind power — by 704 MWe, in plants powered with solid biomass — by 102 MWe, in biogas plants — by 17 MWe. Whereas, in terms of quantity of electric energy projected to be generated within one year, the proportions were slightly different and were as follows: in wind power — 1 790, in biomass power plants 650 GWh, in biogas power plants 144 GWh. Among the studied projects, biomass power plants were characteristic of the most favorable values of investment contributions for 1 MWh of planned production of electric energy. Their average value was much lower than in the case of a biogas plant (by 178%) and wind power plants (220%).
Citation rules
Licence
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.